Frame Damage Screen

Use this screen to us as an aid for your frame diagnosis. This screen allows you to document frame and unibody corrections that need to be performed.

Description of fields on the screen

Field Label Description
Diagram This is a graphic depictions of a frame.
Dimensional Corrections Description Enter the description of the frame correction. Use as many line entries as you need.
Hours Enter the repair hours for each entry.
Category This is a column description of the setup and correction entries.
Dimensional Correction This represents the total of all entries on the screen in the Frame Damage pane.
Setup Enter the number of hours for setup in the Hours field for this entry.
Hours
Rate $
Total $
There are two values. One is for the setup amount and the other represents the values from the entries. As you enter information in this screen, the Total $ amounts are updated .
Note Enter any notes specific to the frame or unibody worksheet.
Amount Applied to Estimate This value is the total frame repair amount.
Insert to Top of Estimate Select this to create a new estimate line at the top of the estimate. If the estimate is already locked, you will be prompted to create a supplement, if you have the rights to do so.
Append to Estimate Select this to create a new estimate line at the bottom of the estimate. If the estimate is already locked, you will be prompted to create a supplement, if you have the rights to do so.
Save Only Select this option to save the information as a draft. You can reopen this sheet again.
Cancel Selecting this option closes the screen without saving.

See Also

Working with the Frame Damage Worksheet

 

 

 

 

 

 

© 2024 CCC Intelligent Solutions Inc. All Rights Reserved.
CCC, CCC ONE, and the CCC Logo are registered trademarks of CCC Intelligent Solutions Inc. 9/16/2024 - 4:37 PM